Water Availability Modeling
Permanent URI for this communityhttps://hdl.handle.net/10850/1309
Browse
Browsing Water Availability Modeling by Title
Now showing 1 - 17 of 17
- Results Per Page
- Sort Options
Item 1Final Report - Neches River Basin Water Availability Study(2001) Brown & Root; Freese and Nichols, Inc.; Espey-Padden Consultants; Crespo Consulting EngineersItem 2Appendix O Neches Final Report(2001) Brown & Root; Freese and Nichols, Inc.; Espey-Padden Consultants; Crespo Consulting Engineers; Brown & Root; Freese and Nichols, Inc.; Espey-Padden Consultants; Crespo Consulting EngineersItem Final Report- San Jacinto River Basin Water Availability Study(1999-12-31) Espey, Padden Consultants, Inc. and the Texas Natural Resource Conservation CommissionItem Final Report- Trinity River Basin and Trinity-San Jacinto and Neches-Trinity Coastal Basins Water Availability Study(2002-03) Espey Consultants, Inc. and the Texas Natural Resource Conservation CommissionItem Final WAM Assessment Report-Cypress Basin(2002-03-29) KSA Engineers, Inc. and the Texas Natural Resource Conservation CommissionItem Lavaca River Basin, Colorado-Lavaca Coastal Basin and Lavaca-Guadalupe Coastal Basin Water Availability Model Final Report(2002-02-07) Texas Natural Resource Conservation Commission, U.S. Bureau of ReclamationItem Naturalized Flow Estimates for the Brazos River Basin and the San Jacinto-Brazos Coastal Basin(2001-10) Freese and Nichols, Inc., HDR Engineering, Inc., Crespo Consulting Services, Inc., Densmore and Dufrain ConsultingItem Red and Canadian River Basins Water Availability Study(2002-03-28) Espey Consultants, Inc. and the Texas Natural Resource Conservation CommissionItem Water Availability in the Brazos River Basin and the San Jacinto-Brazos Coastal Basin(2001-12) HDR Engineering, Inc. and the Texas Natural Resource Conservation CommissionItem Water Availability in the Guadalupe-San Antonio River Basin(1999-12) HDR Engineering, Inc. and the Texas Natural Resource Conservation CommissionItem Water Availability in the Nueces River Basin(1999-10) HDR Engineering, Inc., and the Texas Natural Resource Conservation CommissionItem Water Availability Model for the Nueces-Rio Grande Coastal Basin(2002-03) PBS&J, R.J. Brandes Company, Espey Consultants, Inc., Crespo Consulting Services, Texas Natural Resource Conservation CommissionItem Water Availability Model for the San Antonio-Nueces Coastal Basin(2002-03) PBS&J, Espey Consultants, Inc., Densmore and DuFrain Consulting, Texas Natural Resource Conservation CommissionItem Water Availability Modeling for the Colorado/ Brazos-Colorado Basin, Water Availability Assessment- Final Report(2001-12) R.J. Brandes Company, Crespo Consulting Services, Inc., Brown & Roots Services, PBS&J, Texas Natural Resource Conservation CommissionItem Water Availability Modeling for the Rio Grande Basin(2004-03) R.J. Brandes Company, Texas Commission on Environmental Quality, Parsons, Espey Consultants, Inc., Riverside Technology, Inc., Crespo Consulting Services, Inc.Item Water Availability Modeling for the Sabine River Basin(2001-12-20) Brown and Root Services, Inc., Texas Natural Resource Conservation CommissionItem Water Availability Modeling for the Sulphur River Basin-Final Report(Texas Natural Resource Conservation Commission, 1999-06) R.J. Brandes Company